Me, Eamon, Ryan, and Dylan were working together on our bridge. We were creating a 3 dimensional bridge with an x design in the middle. We completed both sides and were working on the I-beam to connect the two sides together when we ran into a problem. Our classmate Alex broke one side of our bridge by accident by lifting it up in the air and moving it up and down. The Bridge snapped in half and many pieces snapped off. There was only a few days left to work on the bridge project, so we had to team up with Alex and Brandon. We had to contribute by strengthening the bridge by adding I-beams to the bridge. We added around 15 i beams to the bridge and at the end of our process of adding the I beams to the bridge we felt that our bridge was going to be a success. The day of the test to see if the bridge would hold our weight, we all got on the bridge and when Ryan stepped on we heard a crack which was followed by the whole bridge collapsing. So in the end all though our bridge was nice, it was not a success. Our goal was to hold the weight of me, Ryan, Dylan, Alex, Brandon, and Mr. Ramos, which was around the weight of 780 pounds. We did not reach our goal.